Pinellas County Utilities will be repairing and replacing a sanity sewer manhole and pipe at 399 Tom Stuart Causeway near Gulf Boulevard in Madeira Beach starting Monday, Sept. 12. Construction is expected to last one week and will take place on a private access road where the manhole and pipe are located.
A portion of Tom Stuart Causeway will be reduced to one lane to allow for safe construction work. Roadway traffic traveling northeast on the causeway may experience delays. A sidewalk detour will be created through the construction area for pedestrians.
Pinellas County Utilities does not anticipate any disruption to services.
Original source can be found here.